Lit. No. 27366, Rev. 01 February 15, 2008
26
COVER AND FINAL ASSEMBLY
SYSTEM OVERVIEW – ELECTRICAL
Before any service, remove breather slowly
to relieve reservoir pressure.
Use long cable tie to secure cable
in original position.
Apply dielectric grease to terminals.
Fit top retainer ring
over cover ridges.
Breather must be installed
before operating snowplow.
1/4-20 x 1/2 Round Washer-Head
Shoulder Screw (5) – 60-80 in-lb.
3/8-16 x 1 Hex Cap Screw (3)
25-33 ft-lb.
Short cable tie holds
cable in cover slot.
Fit bottom retainer ring
into cover ridges.