10.6Addressing (assignment) of the operation module
Due to addressing with the programming switch (DIP-switch) the operation
module is assigned to the heating circuit module.
Only by the MES-module BUUL RT/UULLRT C1 required resp. possible.
The programm switches on the backside of the controller have to be set to the
required function.
DIP-switch no. 2 is always on OFF.
Warn
: Switch on the power supply on the boiler (and therefore
on the heating circuit module) if all wiring work are done and the
operation module is connected to the base plate (Intitialising the
electronics).
Wait until the display shows the right temperature
on the operation
module to start with the settings. The duration of the initalising
takes max. 2minutes.
Function
DIP-switch
no. 1 no. 2
Remote control Heating circuit 1 OFF OFF
Heating circuit 2 ON OFF