12 3062555_201804
5. Deliveredcondition/
standarddelivery
Deliveredcondition
Gascondensingboiler
The standard delivery includes:
1 Gascondensingboilerreadytoconnectwiththecasingtted
1 Mounting bracket for mounting on the wall, with installation
accessories
1 Installation instructions
1 Operating instructions
1 Maintenance instructions
1 Trap with hose
1 Maintenance tools
Accessories
The following accessories are required for installation of the
gas condensing centre:
- Balancedueaccessories(seetechnicalinformation)
- Room temperature-dependent or weather-compensated
control
- Condensate drain outlet with hose retainer
- Gasballvalvewithreprotection
- Fittingassemblyforheatingow,heatingreturnandintegral
safety assembly
- Pump assembly with variable speed pump and integral safety
assembly
- Low loss header set for one or two appliances in a cascade
- Dirtlterintheheatingreturn
Boilerconnections
Fig.: Connections with heating circuit connection set (accessory)
Heatingow
G 1½"
Gas connection
R ¾"
Heatingreturn
G 1½"
Condensate
drain
Heatingcircuitpumpassembly(accessory)
Fig.: Pump assembly (accessory)
Heatingow
G 2"
Heatingreturn
G 2"
Trap
Gas tap
Connection
Expansion vessel 1"
Drain&llvalve
Drain&llvalve
Pressure gauge
Safety valve
Modulating
pump