40 3062555_201804
24.Commissioningreport
Commissioning steps Testvaluesorconrmation
1.) Gas type
NaturalgasE/H
Natural gas LL
LNG
Wobbe Index
Operationalcaloricvalue
________________
________________
kWh/m³
kWh/m³
2.) Gas supply pressure checked?
3.) Gas tightness test carried out?
4.) Air/uesystemchecked?
5.) Water connections checked for tightness?
6.) Filling the trap
7.) Boiler and system vented?
8.) System pressure 1.5 - 2.5 bar?
9.) Systemushed?
10.) Water treatment carried out according to “Technical
information for water treatment”.
pHvalueset
total hardness set
________________
________________
pHvalue
°dH
11.)
No chemical additives (inhibitors; antifreeze) added?
12.) Gas type and heating output entered on label?
13.) Function test carried out?
14.)
Flue gas test:
Flue gas temperature gross
Inlet air temperature
Flue gas temperature net
Carbon dioxide content (CO
2
) or oxygen content (O
2
)
Carbon monoxide content (CO)
________________
________________
________________
________________
________________
t
A
(°C)
t
L
(°C)
(t
A
-t
L
)
(°C)
%
ppm
15.) Casingtted?
16.) System user instructed; documentation handed over?
17.) Commissioningconrmed? ________________