EasyManua.ls Logo

World Cat 280DC-X - Docked Boat Preparations

Default Icon
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43
Chapter 8: Hurricane Preparedness Customer Checklist
Equipment To Be Kept On Board:
□ Chang gear
□ Fenders
□ Flashlight with spare baeries
□ Two sucient anchors with 300’ or
more oversized rode
□ Baery-operated radio
□ Exterior lights operable
□ Auto bilge pump operang (check baery)
□ Hatches are waterght
□ Power and electric gear operang
□ Engine baery charged
□ Flashlight baery charged
□ Radio baeries charged
□ Learn marina approaches and basin
□ Learn the size and type of your mooring
□ Ensure mooring and lines are sucient for all likely wind direcon and velocity
□ Ensure mooring has enough weight and scope and is properly set
□ Learn your moorage lease and rental agreement responsibilies
□ Learn responsibilies for your boat’s safety when a hurricane is approaching
□ Develop a plan for securing your vessel outside the marina if you plan to evacuate
□ If evacuang, visit the site by boat and me the trip
□ Learn what possible delays you may encounter when evacuang (drawbridges, boat trac ,etc.)
□ Photograph your boat and surroundings
□ Keep a list of all equipment on board
□ Keep a list of all equipment that will be removed during storm preparaons
□ Keep a complete set of records for your boat at home
□ Give the marina operator the name and number of your absentee skipper
□ Give the marina operator a descripon of your boat, registraon number and locaon
□ Strip all removable items, including spare rigging
□ Clear self-bailing cockpit drains
□ Close all through-hull ngs
□ Set chang gear where lines will rub (chocks, cross lines, deck edge, dock edge etc.)
□ Remove portable fuel and oil storage containers
□ Remove ship papers
□ Shut o fuel tanks
□ Leave anchor light on
□ Leave auto bilge pump on
□ Check openings to ensure boat is waterght
□ Set and check storm anchors
□ Consider aaching 3 sets of bow and stern spring lines
□ Consider aaching lines to cleats at a 45 degree angle
□ Consider tying your boat between two piers or along a pier and anchored o one side
Check Monthly:
To Do At A New Marina:
Docked Boat Preparaons:

Table of Contents