4. Fasten the remaining casing bolts and washers to the torque values specified in Screw
torque values on page 99.
Important: It is important to apply the correct amount of torque to the casing bolts to
establish a proper seal at the parting flange.
5. Thread in the casing jacking screws for future use and to prevent thread corrosion.
Shaft guard and flush line assembly
6. Place each shaft guard around the exposed shaft between the bearing housing and
seal chamber. Align the slots on either side of the shaft guard with the holes located
near the bearing housing flange.
7. Fasten the shaft guards to the bearing housing.
8. Fasten the four arm tube into the top of the upper casing.
9. Insert the appropriate plug into the top of the four arm tube.
10.Attach valves to the remaining two arms of the four arm tube.
6 Maintenance
e-XC INSTRUCTION MANUAL 83