EasyManua.ls Logo

Yale SHAW-BOX

Yale SHAW-BOX
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Installation
03.2018 35
ba-o.2.6.0-us-1.1-y | A11867501 Rev AA
4.5 Double rail trolley (OE-S)
The double rail trolleys are supplied with mounted buffers.
NOTICE
The trolley must run smoothly over the whole runway without jamming or increased
friction at the wheel flanges. Increased friction at the flanges due to poor beam quality or
incorrect trolley adjustment may lead to increased wear.
Ensure that the trolley runs smoothly without increased friction at the wheel flanges.
1. The runway must meet the requirements of ISO 12488-1.
2. Make sure that the rail joints are even on both running and guide surfaces. Grind
down if necessary.
Check track gage
Ø D
S
[in]
[in]
3.9
0.1 - 0.2
4.9
0.1 - 0.2
6.3
0.14 - 0.24
7.9
0.18 - 0.28
Tab. 15
Fig. 24
1. Check track gage “S” on trolley and rail (Smax Smin = 0.197 in.)
2. Check lateral play “S” between rail and flange.
3. “S” as per Tab. 15, if trolley is positioned symmetrically on runway.
If asymmetrically, S
left
+ S
right
= 2 × S.
Transport anchor screws
(only on trolleys with wheel diameter D = 4.9 in.)
Fig. 25
1. Remove transport anchor screws “TS”.
Bolt buffers and stops
1. Bolt rubber buffers to trolley or runway end stop.
2. Fit suitable stops (dimensions see next section).

Table of Contents

Related product manuals