EasyManua.ls Logo

Yale SHAW-BOX

Yale SHAW-BOX
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Inspection and maintenance
03.2018 79
ba-o.2.6.0-us-1.1-y | A11867501 Rev AA
7.14.2 Replacement of wire rope due to broken wires
Part number of rope see factory certificate.
Number of permissible broken wires see rope certificate.
YKA/SKA
YKC/SKC
YKE/SKE
Fig. 86
Fig. 87
7.14.3 Removing rope guide
First method (preferable!)
1. Unscrew protective plate (1) under the rope drum at points (a). The rope guide can
then be rotated freely. Do not unscrew stop with bearing (2)!
2. Unscrew screws (3).
3. Unscrew rope guide safety cable (4) (if any) on one side.
4. Remove half-rings.
5. Unhook rope tensioning spring.
Second method
1. Unscrew stop with bearing (2) from rope guide. The rope guide can then be rotated
freely. Continue as described under 1.
Fig. 88
YKE/SKE (2PS)
NOTICE
Material damage hazard
The stop with bearing (2) is locked with a conical spring washer DIN 6796. Refit the
spring washer correctly.

Table of Contents

Related product manuals