7 Inspection and maintenance
60 03.2018
ba-o.2.6.0-us-1.1-y | A11867501 Rev AA
7.1 Inspection intervals
Fig. 70
Test every day
before starting
work *1
Periodic inspection
every 12
months *2
Inspection table
see page
Function of brakes (1) with regard to braking efficiency and activation
Emergency hoist limit switch (2), if there is no operational hoist limit switch, operational hoist limit
switch, if any
70
Emergency stop, travel limit switches, crane switch
42
Rope (4)
78
Check state of system for obvious defects
Check suspension of control pendant (cable and steel wire must be correctly
attached)
Load hook (5), cracks, distortion, wear, corrosion, function of hook safety latch
Overload safety device (6)
77
Disconnect switch and main isolator
42
PE connections and equipotential bonding
Establish remaining service life
86
Rope attachment (10) and rope sheaves
78, 83
Rope guide (11)
79, 81
Drive parts (12), wheel flanges, wheels etc.
85
Bolt joints, welds
End stops, buffers
Safety clearances
Power supply cable
Cable glands
Towing arm
Switching functions
All parts in the power flux
*1 By user
Periodic inspections including maintenance at least every 12 months, possibly more
frequently if so prescribed by national regulations, to be performed by a qualified person.
*2 Heavy duty or unfavorable conditions (dirt, solvents, multi-shift operation, etc.)
entail a reduction of this inspection and maintenance interval.
WARNING
Safety hazard. If work needs to be carried out on live parts, a second person must be
present who can stop dangerous movements in an emergency by means of the
emergency stop or disconnect the power supply by means of the main isolator /
disconnect switch.
W0789
12
5
4
12
1
1212
W0791