EasyManua.ls Logo

YASKAWA MA1440 - Connection of the robot controller; Connecting the programming pendant

YASKAWA MA1440
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wiring
5 - 28
5.2.2 Connection of the robot controller
Attach the robot cables in the following order.
1. Connect the encoder cable (1BC) X11 at X-1 connection to the robot controller.
2. Connect the power cable (2BC) X21 at X-2 connection to the robot controller.
Make sure that you hear the locking clips snap into place (clicking sound).
Fig. 5-4: Connection of the robot controller
5.2.3 Connecting the programming pendant
Connect the programming pendant cable to the connection (X81) (see diagram
"Connecting the programming pendant")
Fig. 5-5: Connection programming pendant
Alignment marks
X 11
X 21
X -1
X -2
1
X81
X81
PROGRAMMING PENDANT
PROPERLY.
CHECK ALL THE DOOR LOCKS
NJ3005-1
kVA
kVA
ERDR-
Average
Peak
NJ3053-1
Kammerfeldstr. 1, D-85391 Allershausen
2-1 Kurosaki Shiroishi Yahatanishi-Ku Kitakyushu-City Fukuoka 806-0004 Japan
YASKAWA Electric corporation
Robot Serial No.
Robot Order No.
Robot Type
Type
Date/Signature
Serial No.
AC 400/415/440 V
Power Supply
Part No.
Motoman DX100
with power ON.
WARNING
Do not open the door
High Voltage
1

Table of Contents

Related product manuals