Maintenance and inspection
9 - 54
Inspection intervals
Item number
1
Schedule (h) Method Operation To be per-
formed by:
Daily
1000
6000
12000
24000
36000
12 3
1 Alignment marks Visual inspection Check alignment mark correspondence and
damage at the zero position.
2 External cables Visual inspection Check cables for damage.
3 Working area and robot Visual inspection If the working area is dirty, it must be cleaned.
Check the robot for damage and external cracks.
4 Motor for S-, L-, U-axes Visual inspection Check for grease leakage.
5 Fixing screws of the base
plate
Using a correspond-
ing tool,
tighten loose screws (replace if necessary).
6 Fixing screws of the cover Using a correspond-
ing tool,
tighten loose screws (replace if necessary).
7 Power input module Manually Check for loose connections.
8 Toothed belt for B- and T-axes Manually Check for tension and wear
9 Wiring harness in the robot
(wires of the S-, L-, U-, R-, B-
and T-axis)
Visual inspection
with multimeter
Check the bushing between the connector on
the stand and the intermediate connectors by
manually moving the wires. Check the protective
coil.
2
.
Exchange
3
10 Wiring harness in the robot
(wires of the B- and T-axis)
Visual inspection
with multimeter
Check the wires between the terminals for wear.
Exchange