EasyManua.ls Logo

Zebra TC56

Zebra TC56
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Accessories 2 - 33
Rack Mount Installation
1. Secure mounting brackets to both sides of top tray with four M5 screws (two on each side). For 5-Slot cradles,
position the flange for horizontal installation. For 4-Slot Battery Chargers, position the flange for 25°
installation.
Figure 2-40 Flange Horizontal Position (5-Slot Cradles)
Figure 2-41 Flange 25° Position (4-Slot Battery Chargers)
NOTE Use screws provided with rack system. Refer to rack user documentation for instructions.
Fifth Screw Hole
Flange
Top Screw Hole
Flange
CAUTION Install mounting bracket with 5-Slot cradle at a maximum height of four feet from ground.
Install mounting bracket with 4-Slot Battery Charger at a maximum height of three feet from ground.
NOTE Distance between two horizontal mounted brackets should be at least 14” apart (from top of one flange to the
top of the next flange).
Distance between a horizontal mounted bracket and a 25° mounted bracket should be at least 16.25” apart
(from top of one flange to the top of the next flange).
There should be enough clearance (2.75”) between the top of the device and the bottom of the mounting
bracket above.

Table of Contents

Other manuals for Zebra TC56

Related product manuals