EasyManua.ls Logo

ZiLOG System 8000 - Page 82

Default Icon
366 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HRM
Zilog
HRM
(4)
ECC
Test
-
Tests
the
system's
error
detection
capabili-
ties.
(5)
Peripheral
Equipment
Test
-
Does
a
cursory
check
of
the
Winchester
Disk
and
Tape
Cartridge
Controllers.
If
SPUD
detects
a
problem
with
the
system,
an
error
message
is
displayed
on
the
console
of
the
system
administrator
(ZEUS
super-user).
Table
3-3
lists
the
error
messages
.and
descriptions.
A
possible
solution
to
a
power-up
error
condition
is
to
check
that
all
cable
connectors
are
properly
mated,
and
that
all
system
boards
are
seated
in
their
backplane
connectors.
If
problems
still
exist,
run
the
SADIE
diagnostics
described
in
Section
5,
Maintenance.
3-31
Zilog
3-31

Table of Contents

Other manuals for ZiLOG System 8000

Related product manuals