EasyManua.ls Logo

Zoomlion RT100 - Page 49

Default Icon
174 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
05 - 10 RT100 Rough Terrain Crane
Lift a load that is above the capacity of the crane.
Pull a load at an angle.
Lift a load that is not in balance.
(
(
8
8
)
)
Do not try to lift a load that is buried or frozen on the ground.
(
(
9
9
)
)
Do not extend / retract the boom with a suspended load.

Related product manuals