RT100 Rough Terrain Crane 07 -
13
7.13 HOIST OPERATION
The winch mechanism consists of the hydraulic motor, winch reducer, brake, rope guider,
anti-two block system, 3
rd
wrap, hoist rope and main hook and auxiliary hook.
The winch mechanism mainly includes two parts - main winch and auxiliary winch.
Note
Always refer to the “Lift Chart” and the “Lift Height Chart” before you start to lift a
load.
A. Lift Chart Interpretation
(1) Lift Chart and Lift Height Chart
(a) Lift Chart
1 How to look up rated lift capacity.
2 Use the Lift Height Chart to find out the boom length and working radius.
Use the Lift Chart to find out the rated load.
Note
Use the Lift Chart to find out the rated load if you lift a load with jib assembled at
the main boom head.
3 Use the below figure to find out the rated load if the outrigger beams are
fully extended and the main boom is over side or over rear.
Figure 07 5 Rated Load
Use working conditions to find the rated load.