RT100 Rough Terrain Crane
07 - 14
(b) Lift Height Chart.
Figure 07 6 Lift Height
The data in the Lift Height Chart does not include the bend of the main
boom.
(c) Working Radius.
Figure 07 7 Working Radius
1 The balance valve in the hoist mechanism makes sure that the
movement of the hoist is stable. It also makes the load stop at the
necessary location.
2 When you increase the boom length and height, you must increase the
length of the hoist rope. You can change the line parts to get a longer
rope. You must install the anti-two block weight before you change the
parts.
B. Main Winch
(1) The right joystick controls the main winch. Push the joystick forward to reel-off to
move the load down. Pull it to the rear to spool-up to move the load up.