07 - 20 RT60 Rough Terrain Crane
HOIST LINE REEVING
Before reeving the crane in preparation for any job, retract the boom and swing it over
front.
Change the line parts as follows:
a) Luff the boom down to lay down the hook onto the ground;
Fig. 07 - 11
b) Remove the rope securing tubes;
Fig. 07 - 12
c) Remove the counterweight of anti-two block;
Fig. 07 - 13