EasyManua.ls Logo

ABB ACS1000 - Auxiliary Power, Control and Serial Communication Cables; Preparing the Cable Entry and the Cables

ABB ACS1000
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
07 ELECTRICAL INSTALLATION
3BHS213401 E01 REV H ACS1000 AIR-COOLED USER MANUAL 98/184
7.6 Auxiliary power, control and serial
communication cables
7.6.1 Preparing the cable entry and the cables
7.6.1.1 Determining the cable length
1. Determine the required length of a cable between the point of entry and the connection
point (1 in Fig. 7-12) inside the cabinet.
2. Cut the cable to the required length before connection.
Figure 7-12: Cable entry from top (A), from bottom (B)
See Layout drawing in Appendix C – Mechanical drawings for information on:
- Project-specific cable entry
- Dimensions between point of cable entry and terminals
See Appendix D – Wiring diagrams for information on:
- Conventions for cross-references and device identification
- Terminal designations
1
1
AB

Table of Contents

Related product manuals