About this manual
18
The ACS800-02/U2 describes the drive.
Planning the electrical installation instructs on the motor and cable selection, the
protections and the cable routing.
Installation instructs how to place, mount and wire the drive.
Motor control and I/O board (RMIO) shows external control connections to the motor
control and I/O board and its specifictions.
Installation checklist helps in checking the mechanical and electrical installation of
the drive.
Maintenance contains preventive maintenance instructions.
Technical data contains the technical specifications of the drive, e.g. the ratings,
sizes and technical requirements, provisions for fulfilling the requirements for CE
and other markings and warranty policy.
Dimensional drawings contains the dimensional drawings of the drive.
Resistor braking describes how to select, protect and wire optional brake choppers
and resistors. The chapter also contains technical data.
Installation and commissioning flowchart
Task See
Identify the frame size of your drive, R7 or R8. Technical data/ IEC ratings or US tables/NEMA
ratings
Plan the installation.
Check the ambient conditions, ratings, required
cooling air flow, input power connection, compatibility
of the motor, motor connection, and other technical
data.
Select the cables.
Technical data
Planning the electrical installation
For compliance with the European Union EMC
Directive, see Technical data: CE marking
Option manual (if optional equipment is
included)
Unpack and check the units.
Check that all necessary optional modules and
equipment are present and correct.
Only intact units may be started up.
Installation: Moving the unit.
If the converter has been non-operational for
more than one year, the converter DC link
capacitors need to be reformed. Ask ABB for
instructions.
Check the installation site. Installation: Before installation
Technical data