D-4 Mechanical Installation 3AXD50000011888
D.6 Unpacking and Examining the Delivery (Frames R6 to R9)
This illustration shows the layout of the transport package. Examine that all items are present and there are no signs of
damage. Read the data on the type designation label of the drive to make sure that the drive is of the correct type.
Figure D-5
1
2
3
4
5
6
7
8
Table D-2
Item Description Item Description
1 Cable entry box. Power and control
cable grounding shelves in a plastic
bag, assembly drawing. Note: The
cable entry box is mounted to a IP55
drive module frame at the factory.
5 Cardboard sleeve
2 Drive with factory installed options 6 Straps
3 Top cardboard cover 7 Printed quick guides and manuals
CD and multilingual residual
valtage warning sticker
4 Cushion 8 Pallet tray
To unpack:
Cut the straps (6).
Remove the top cardboard cover (3) and cushion (4).
Lift the cardboard sleeve (5).
Attach lifting hooks to the lifting eyes of the drive. Lift the drive with a hoist.