EasyManua.ls Logo

ABB ACS880-01-061A-3+N5350 - Page 234

ABB ACS880-01-061A-3+N5350
247 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ModbusTCP Setup E-73AXD50000011888
Troubleshooting:
You can verify the CW being received by the drive by looking at par 6.03 FBA A Transparent Control Word. This will be the
raw value being sent by the PLC.
You can verify the current speed reference being used by the drive by looking at par 47.01 Data Storage 1 real32. This
parameter will contain the active reference whether it comes from Fieldbus or an analog input.

Table of Contents

Related product manuals