EasyManua.ls Logo

ABB ACS880-07XT Series - Installation Checklist; Pre-Startup Warnings; Installation Checklist Items

ABB ACS880-07XT Series
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation checklist 105
8
Installation checklist
Contents of this chapter
This chapter contains an installation checklist which you must complete before you start up
the drive.
Warnings
WARNING! Obey the instructions in chapter Safety instructions. If you ignore
them, injury or death, or damage to the equipment can occur.
Checklist
Do the steps in section Precautions before electrical work before you start the work. Go
through the checklist together with another person..
Check that …
The ambient operating conditions meet the specifications given in chapter Technical data.
The drive cabinet has been fixed to floor, and if necessary due to vibration etc, also from top to the
wall or roof.
The cooling air will flow freely in and out of the drive cabinet,
If the drive will be connected to an IT (ungrounded) or a corner grounded TN network:
The optional
EMC filter (+E201) of the drive (if any) has been disconnected.
If the drive has been stored over one year:
The electrolytic DC capacitors in the DC link of the drive
have been reformed. See Converter module capacitor reforming instructions (3BFE64059629
[English]).

Table of Contents

Related product manuals