44 Mechanical installation
Necessary tools
The tools required for moving the unit to its final position, fastening it to the floor and wall
and tightening the connections are listed below:
• crane, fork-lift or pallet truck (check load capacity!), slate/spud bar, jack and rollers
• Pozidriv and Torx screwdrivers
• torque wrench
• set of wrenches or sockets.
Checking the delivery
The drive delivery contains:
• drive cabinet line-up
• optional modules (if ordered) installed onto the control unit at the factory
• appropriate drive and optional module manuals
• delivery documents.
Check that there are no signs of damage. Before attempting installation and operation,
check the information on the type designation labels of the drive to verify that the delivery
is of the correct type. See section Type designation key on page 40.