EasyManua.ls Logo

ABB Endura AZ20 series

ABB Endura AZ20 series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Combustion Oxygen Monitor
Endura AZ20 Series Probe 5 Dismantling and Reassembly – Probe
IM/AZ20M–EN Rev. B 33
Referring to Fig. 5.18:
16. Fit test gas to sensor tube
M and reference air tube ?N
17. Fit test gas 1 and 2 tubes ?O
18. Push the 2 terminal plugs P into the terminal blocks and
locate / tighten the terminal plug M3 retaining screws
?Q
19. Refit the probe end cap.
20. If the external test gas 2 connection is to be used, remove
the test gas 2 blanking plug R using the 6 mm wrench
supplied and fit correct connector S (NPT or BSP).
21. Record AutoCal upgrade details on the existing
Commissioning Label T.
If a new cell has been fitted, record the AutoCal upgrade
details and the new cell data details on the new
Commissioning Label and re-calibrate the probe using the
new cell data – refer to the transmitter User Guide
(IM/AZ20E-EN).
22. Re-install the probe as detailed in the probe User Guide
(IM/AZ20P–EN).
23. At the transmitter, set the 'Calibrate / AutoCal Hardware /
Hardware Type' to 'Internal' – refer to the transmitter User
Guide (IM/AZ20E–EN).
24. Make gas supplies to the probe and electrical supplies to
the transmitter – refer to the transmitter User Guide
(IM/AZ20E–EN) for electrical supplies and the probe User
Guide (IM/AZ20P–EN) for gas and reference air supplies.
Fig. 5.18 Connecting the Gas / Air Tubes and
Recording Commissioning Details

Table of Contents

Other manuals for ABB Endura AZ20 series

Related product manuals