EasyManua.ls Logo

ABB IRB 1010 - Page 64

ABB IRB 1010
334 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CAUTION
To calibrate the axis 6, the notch on the wrist must be aligned with the marked
pin hole on the tool flange. Before installing a tool on the tool flange, make sure
a visible mark has been made to the tool at the corresponding position.
For details about the synchronization mark, see Synchronization marks and
synchronization position for axes on page 283.
Fastener quality
When fitting tools on the tool flange, only use screws with quality 12.9. For other
equipment use suitable screws and tightening torque for your application.
64 Product manual - IRB 1010
3HAC081964-001 Revision: B
© Copyright 2022 ABB. All rights reserved.
3 Installation and commissioning
3.3.6 Fitting equipment on the robot (robot dimensions)
Continued

Table of Contents

Related product manuals