6.6 Configuration Verification
The configuration can be verified with the "bw" command, see below
dnet_gw> bw
-----------------------------
DeviceNet bus status.
-----------------------------
Node number : 3 [0x3]
Bus speed : 250 kbits
Bus power : VALID
Bus status : OFFLINE
-----------------------------
Current setup done by PLC system.
Input assembly 1 = PLUTO Data Only [102]
Output assembly 1 = To PLUTO Data [113]
Expected PLUTO 00-15 : 00 01 02 03 -- -- -- -- -- -- -- -- -- -- -- --
Expected PLUTO 16-31 : -- -- -- -- -- -- -- -- -- -- -- -- -- -- 30 31
Enabled To PLUTO package 0-3 : 0 1 2 3 , Timeout 1000 ms .
-----------------------------
dnet_gw>
Don’t forget to document the configuration by copy/past the terminal text to a configuration
document for use if new gateway needs to be configured.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Pluto Series and is the answer not in the manual?

ABB Pluto Series Specifications

General IconGeneral
MountingDIN rail
Current consumptionTypically 100 mA
Communication interfaceEthernet
Protocols supportedModbus TCP, PROFIBUS DP
EnclosureIP20
Supply voltage24 VDC
WeightApprox. 200 g