Mounting panel
Metallic frame for mounting the RTXP 18 or 24 test switch to the panel
An IED equipped with optical connections requires a minimum
depth of 180 mm. The allowed minimum bending radius has to be
checked from the optical cable manufacturer.
To rack mount the IED into a 19" equipment frame:
1. Mount the mounting panel into the 19" rack.
2. Loosen the four M5 fixing screws in the case to fit the case into the panel cut-
out.
3. Mount the case to the panel cut-out.
4. Install the optional metallic frame to mount the RTXP 18 or 24 test switch to
the panel.
A071312 V3 EN
Figure 19: Mounting of the metallic frame for an RTXP 18 test switch
1MRS756375 K Section 4
Mounting
615 series 33
Installation Manual