EasyManua.ls Logo

ABB RELION 670 SERIES REG670 - Page 605

ABB RELION 670 SERIES REG670
830 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ANSI10000044-1-en.vsd
L
o
a
d
T
a
p
C
h
a
n
g
e
r
raise,lower
signals/alarms
position
MIM
BOM
IED
TRM
3ph or ph-ph or 1ph Currents
High Voltage Side
Low Voltage Side
Line Impedance R+jX
Load Center
3ph or ph-ph or 1ph Voltages
IA,IB,IC
(Load Current) IL
VL (Load Point Voltage)
VB (Busbar Voltage)
BIM
ANSI10000044 V1 EN-US
Figure 281: Signal flow for a single transformer with voltage control
On the HV side, the three-phase current is normally required in order to feed the three-
phase over current protection that blocks the load tap changer in case of over-current
above harmful levels.
The voltage measurement on the LV-side can be made single phase-ground. However,
it shall be remembered that this can only be used in solidly grounded systems, as the
measured phase-ground voltage can increase with as much as a factor √3 in case of
ground faults in a non-solidly grounded system.
The analog input signals are normally common with other functions in the IED for
example, protection functions.
The LV-busbar voltage is designated V
B
, the load current I
L
and load
point voltage V
L
.
1MRK 502 071-UUS A Section 15
Control
Generator protection REG670 2.2 ANSI and Injection equipment REX060, REX061, REX062 599
Application manual

Table of Contents

Related product manuals