Use a secondary injection IED test set to operate the protection function. The test set shall
be switched off when a trip signal is given or when the BR comes to open position to
simulate real conditions.
The CB simulation can be made more elaborate, including simulation of the operating
gear condition, CBREADY of either the type ready for a Close-Open (CO) cycle, or the
type ready for an Open-Close -Open (OCO) cycle.
The CB condition CBREADY of a type, CO, shall be high (true) until a closing operation
is performed. It then goes low (false) for a recharging time of about 5 -10 s. After that it
is high again.
A CB condition CBREADY of a type, OCO shall be high (true) before and during tripping
(Start Initiate reclosing). During tripping it goes low for a recharging time, for example,
10 s. It may thus be low at the instant of reclosing. After each Open or Close operation it
may need a recharging period before it goes high again.
In the example of CB simulation arrangement, the CBREADY condition is simulated by
a manual switch, SRY.
Information and material for the verification:
Protection or control unit, Intelligent electronic device (IED), configured and with
settings entered
Configuration diagram for the IED
Terminal diagram for the IED, or plant circuit diagram including the IED
Technical reference manual for the IED
IED test set for secondary injection
Means to indicate, measure and record operation and times, e.g. an event recording
facility
A bi-stable relay (BR) or two auxiliary relays to simulate a CB
Two push-buttons (SC, ST) to operate the BR and a change-over switch (SRY) to
simulate CBREADY
Possibly a switch simulation the Synchronism check SESRSYN (25) condition.
6.7.3.1 Preparation of the verification
1. Check the function settings. In the HMI tree they are found under Main menu/
Settings/IED Settings/Control/STBRREC(79,0->1)/STBRREC:1
If any timer settings are reduced to speed-up or facilitate the testing, they shall be set
to normal after testing. A temporary label on the unit can be a reminder to restore
normal settings after which a verification test should be performed.
2. Decide if a synchronization check (SYNC) shall be included in the test.
Section 6 1MRK 505 293-UUS A
Testing functionality
108
Commissioning manual

Table of Contents

Other manuals for ABB REQ650

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB REQ650 and is the answer not in the manual?