EasyManua.ls Logo

ABB SACE Emax 2 Series - Ekip Touch - Test; Test

ABB SACE Emax 2 Series
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ABB | SACE Emax 2
Ekip Touch - Test
1 - Test
136 | © 2023 ABB | 1SDH001330R1002 - ECN000297030
Ekip Touch - Test
1 - Test
Presentation
The test area can be accessed on the display; the commands available in this area allow certain functions
of the Trip unit to be checked; details of all the commands available in the Test menu are given below
(page 50).
Ekip T&P with Ekip Connect has a
Test Protections
section where the presence of current or voltage alarm
signals can be simulated and times and trips can be checked.
Autotest
The Autotest command starts an automatic sequence of the display and leds so as to enable their
operation to be checked.
The sequence comprises the following test phases:
1. Screen with message “www.abb.com”.
2. Darkening of the display.
3. Color sequence with red, green, blue bands, with gradual increase of backlighting.
4. Lighting up, for one second, of the Warning and Alarm leds.
NOTE:
auxiliary power supply must be present in order to check the gradual increase of
backlighting
Trip Test
Selection of the
Trip test
command accesses the dedicated page where the operator is asked to press the
iTEST key to confirm the test operation.
An open command is transmitted to the Trip coil of the CB when the key is released.
IMPORTANT:
the open command is sent with the circuit-breaker closed and in the absence of current
following a command, the user is responsible for checking the effective change in status
of the actuator and the information displayed, make sure that there are no alarms on the
diagnosis bar before performing the test
NOTE:
to reset the TRIP signal, go back to the HOME page and press the
iTEST
key or transmit
a TRIP RESET command (via Ekip Connect or remotely)
Test CB
Selection of the
Test CB
command accesses a submenu with the
Open CB
and
Close CB
commands
allowing the CB to be opened and closed via MOE-E.Selection of the
Test CB
command accesses a
submenu with the
Open CB
and
Close CB
commands. The commands allow opening coil YO and closing
coil YC to be activated, respectively: a window with the message "Test Executed" confirms that the
command has been transmitted correctly.
IMPORTANT:
the open and close commands only function when the Trip unit is on and powered by an
auxiliary supplythe open and close commands of the coils only function when the Trip
unit is on and powered by an auxiliary supply
make sure that the coils are connected to the supply source
release operation is checked by the commands: coil faults are not detected by the
testfaults in Ekip Com Actuator or the coils are not detected by the test

Table of Contents

Other manuals for ABB SACE Emax 2 Series

Related product manuals