EasyManua.ls Logo

ABB SACE Tmax XT2 - Page 173

ABB SACE Tmax XT2
207 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1SDH002031A1002 ECN000092998 Rev. B SACE Tmax XT2 XT4 | 173
Remote
configurations
From the service connector (via Ekip Connect) or with communication by system bus it is possible
to access additional parameters:
Parameter
Description
Default
Frequency
check
Activate (ON) or deactivate(OFF) the frequency control for synchronism
evaluation
ON
Phase control
Activate (ON) or deactivate (OFF) the phase control for synchronism
evaluation
ON
Evaluate switch
status
Activate (YES) or deactivate (NO) the open switch status control for
synchronism evaluation
NOTE: fourth synchronism condition with busbar active;
second synchronism condition with dead busbar
NO
Minimum
matching time
With active busbar, minimum time within which the Delta Phase time has
to be fulfilled
The value is expressed in seconds, settable in a range:
100 ms .. 3 s with 10 ms step
NOTE: this is not a synchronism condition, but a parameter
that enables correct and incorrect combinations of the Delta
frequency and Delta Phase conditions to be made. Owing to
the worst-case latency, the time that elapses before the
synchronism is recognized may be greater than the set time
(circa 20 ms)
100 ms
Measurements
If the Ekip Synchrocheck module is detected correctly by Ekip Touch the specific area of
measurement in the Measurements-Synchrocheck menu is activated
Measurement
Description
Module
OK = synchronism conditions fulfilled
Not OK = synchronism conditions not fulfilled or function disabled
Frequency
OK = frequency synchronism condition fulfilled
Not OK = frequency synchronism condition not fulfilled or synchronism function
disabled or frequencies outside measurement range
--- = Synchronism condition for frequencies is not available (e.g.: for operation
with dead busbar)
Voltage
OK = Voltage synchronism conditions fulfilled
Not OK = Voltage synchronism conditions not fulfilled or function disabled
Phase
OK = Phase-difference synchronism condition fulfilled
Not OK = Phase-difference synchronism condition not fulfilled or synchronism
function disabled or frequencies outside measurement range
--- = Phase-difference synchronism condition is not available (e.g.: for operation
with dead busbar)
Ext Side
Voltage
(1)
Voltage measured by Ekip Synchrocheck, expressed in Volt
.... = DC measurement DC or less than 1 VAC
--- = measurement not available (e.g.: because synchronism function disabled)
Int Side
Voltage
(2)
Voltage measured on the inside outlets, expressed in Volt.
.... = measurement less than 1 VAC
Ext Side
frequency
(1)
Frequency measured by Ekip Synchrocheck
--- = measurement not available (e.g.: because of disabled synchronism or
operation with dead busbar or frequencies outside measurement range)
Int Side
frequency
(2)
Frequency measured on the inside outlets
--- = measurement not available (e.g.: because of disabled synchronism or
operation with dead busbar or frequencies outside measurement range)
Phase
difference
(1)
Phase difference between voltages, expressed in degrees
--- = measurement not available (e.g.: because of disabled synchronism or
operation with dead busbar or frequencies outside measurement range)

Table of Contents

Other manuals for ABB SACE Tmax XT2

Related product manuals