Operating Instructions SYN 5201/SYN 5202
Document No Art Part Language Revision page
abb
ABB Switzerland Ltd
3BHS109762 E01
en D 80
Template: CHIND Techn doc stand, A4 P de, R1.DOT; Filename: 3BHS109762E01 D.doc; Print: 12/6/2011 5:48:00 PM; Save: 12/1/2011 2:37:00 PM; CHIND No. 3BHS109763 ZAB D14 Rev. -; I-Q
Function Commands Keys
IP-address
of the
SynView
Ethernet
interface
Display IP-address
Switch off auxiliary voltage
Hold down & and
switch on auxiliary voltage again (Do
not release keys before the 3 LED's
READY, OPERATING and
BLOCKED are lit)
Quit display
Service IP-address of the IEC 61850-interface See section 7.4.3
Each individual parameter setting must be written into the RAM after being changed. If
this is not done, the old value remains in the FlashPROM when the device is set to
Ready .
S05002
RAM
FlashPROM
DATA
c
c
c
c
LCD
&
&
Write
Set READY
(each parameter individually)
(all parameters)
In order to carry out commissioning work the device must be brought into BLOCKED
status.
Switchover from blocked without error status to ready is blocked if the start command is
active at the moment of switchover.
Note
Caution
Note
c
c
c