EasyManua.ls Logo

Acer AO725 - Main Unit Reassembly Process; Replacing the LCD (Liquid Crystal Display) Module

Acer AO725
277 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Machine Maintenance Procedures 3-53
Main Unit Reassembly Process 0
Replacing the LCD (Liquid Crystal Display) Module 0
1. Place the LCD Module on the base assembly (Figure 3-59).
Figure 3-59. Replacing the LCD Module
2. Align LCD hinges with the hinge guides on the Base Assembly (Figure 3-59).
3. Install and secure three (3) screws (A) to LCD hinges (Figure 3-60).
Figure 3-60. LCD Module
A
A
B

Table of Contents

Related product manuals