3-62 Machine Maintenance Procedures
Replacing the IO Board 0
1. Place IO Board (B) on the base assembly (Figure 3-68).
Figure 3-68. Replacing the IO Board
2. Install and secure three (3) screws (A) to the IO board (Figure 3-69).
Figure 3-69. IO Board
3. Connect AC converter cable (D) to mainboard connector (C) and IO board connector
(E) (Figure 3-69).
4. Connect IO board FPC (G) to mainboard connector (F) and IO board connector (H)
(Figure 3-69).