EasyManua.ls Logo

Allied Telesis AT-MMC6005 - Setting the Provider Unit DIP Switches

Allied Telesis AT-MMC6005
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AT-MMC6000 Series Installation Guide
45
Note
Set the DIP switches before the media converter is installed in the
AT-MMCR18 chassis because the switches are hidden afterward.
2. Refer to the AT-MMCR18 Chassis Installation Guide for installation
instructions.
3. Go to “Cabling the Provider Unit” on page 47.
Setting the
Provider Unit
DIP Switches
1. Set DIP switch 1 to the Down (CO) position as shown in Figure 16.
This configures the media converter as a Provider unit.
Figure 16. Provider Unit DIP Switch Position
Note
DIP switches 2 - 4 configure the VDSL profile and are active only on
the Provider unit. It is important to configure the Provider unit VDSL
profile in the next step - Step 2. The Subscriber unit ignores its own
VDSL DIP switch settings.
2. Set DIP switches 2, 3, and 4 to the desired VDSL2 profile. Refer to
Table 2 on page 24 and Table 3 on page 25 for the profile definitions.
Note
Go to “VDSL2 Configuration” on page 30 for more information.
3. Set DIP switch 5 to the desired SML setting: the Up (ON) position
enables SML; the Down (OFF) position disables SML.
Note
Go to “Smart Missing Link (SML) Configuration” on page 30 and
“Smart MissingLink™ (SML)” on page 31 for an overview more
information concerning this feature.
Provider
(Down - CO position)

Table of Contents

Related product manuals