PAGE 125 ALMAC s.r.l.
2.13.2 Batteries status verification ___________________________________________ 27
2.13.3 Replacement of individual batteries ____________________________________ 28
2.14 BATTERY STATUS MAINTENANCE _________________________________________________ 30
3 DESCRIPTION OF THE MACHINE ____________________________________________ 32
3.1 STRUCTURE OF THE EQUIPMENT__________________________________________________ 32
3.2 CONTROL STATIONS __________________________________________________________ 38
3.2.1 Mobile control push-button panel (console) ________________________________ 38
3.2.2 Ground control using the mobile push-button panel _________________________ 43
3.2.3 Ground controls _______________________________________________________ 43
3.3 OPERATING SAFETY DEVICES ____________________________________________________ 45
3.3.1 Main frame inclination control device _____________________________________ 46
3.3.2 Chassis tilt control device _______________________________________________ 46
3.4 HYDRAULIC SYSTEM SAFETY DEVICES ______________________________________________ 47
3.4.1 Hydraulic pressure limiting devices _______________________________________ 47
3.4.2 Hydraulic block safety devices ___________________________________________ 48
3.5 BLACKOUT SAFETY DEVICES _____________________________________________________ 51
3.5.1 External power source 230V or 110V ______________________________________ 51
3.5.2 12V-48V system ________________________________________________________ 51
3.6 PLATFORM OPERATION DEVICES WHICH ARE NOT PART OF THE SAFETY SYSTEM __________________ 52
4 INSTRUCTIONS FOR USE _________________________________________________ 54
4.1 PRELIMINARY OPERATIONS _____________________________________________________ 54
4.1.1 Suitability of the soil ___________________________________________________ 54
4.2 MACHINE OPERATION _________________________________________________________ 55
4.2.1 Powering of the machine. _______________________________________________ 55
4.2.2 Travel controls ________________________________________________________ 57
4.2.2.1 Standard travel mode ______________________________________________________ 59
4.2.2.2 Easy-Drive System (ED-S) ___________________________________________________ 60
4.2.2.3 Direct-Control System (DC-S)________________________________________________ 60
4.2.2.3.1 Dynamic Levelling ON __________________________________________________ 61
4.2.2.3.2 Dynamic Levelling OFF _________________________________________________ 61
4.2.3 Machine levelling ______________________________________________________ 62
4.2.3.1 Automatic levelling ________________________________________________________ 63
4.2.3.2 Manual levelling __________________________________________________________ 63
4.2.3.3 Dynamic Levelling during travel _____________________________________________ 64
4.2.3.4 Dynamic Position System ___________________________________________________ 65
4.3 POSITIONING OF THE LOAD ON THE MACHINE _________________________________________ 66
4.4 MESSAGES AND ALARMS ON THE HOUR COUNTER ______________________________________ 67
4.5 QUICK COUPLINGS (IF ANY) _______________________________________________________ 70