EasyManua.ls Logo

Amazone Cenius 3003 - Maintenance Plan - Overview

Amazone Cenius 3003
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cleaning, maintenance and repairs
12.3 Maintenance plan - overview
Carry out maintenance work when the first interval is reached.
The times, running hours or maintenance intervals of any third
party documentation shall have priority.
After the first working run
Component Servicing work
see
page
Workshop work
Tine connection
Inspect the bolts
75
Hydraulic system
Inspection for defects
Inspect for leaks
75
X
Weekly/every 50 working hours
Component Servicing work
see
page
Workshop work
Hydraulic system
Inspection for defects
75
X
Tine connection
Inspect the bolts
73
Roller connection
Inspect the bolts
74
Disc carrier connection
Inspect the bolts
74
Scraper on the roller
Check the distance
63
As required
Component Servicing work
see
page
Workshop work
Coulter
Replace
72
Tines
Replace
71
Disc XL041
Inspect for wear - replace when
the minimum diameter of
360 mm is reached
73
X
Disc segments
Replace
72
X
Lower link pin
Replace
77
70
Cenius 03 BAG0144.5 10.19

Table of Contents

Related product manuals