viii | Model 5100 HD Analyzer
Secondary Process Seals Requirement
A”This instrument is supplied with a primary process seal only (single seal
device) in accordance with ANSI/ISA 12.27.01-2003. Proper installation of
this instrument requires a secondary process seal if failure of the primary
process seal could allow process uids to enter the conduit or eld wiring
system. The maximum process gas pressure and temperature that will be ap-
plied are 10 psig (170KPa) and 140F (60C).
For more information refer to ANSI/ISA 12.27.01-2003, the 2006 NEC (clauses 501.15
(F) (3) (CI Div 1/2), and 505.16 (E) (3) (CI Zone 1/2)) or the 2006 CEC Part 1 Rules
18-092 (CI Zone 0), 18-108 (CI Zone 1), 18-158 (CI Zone 2), J18-108 (CI Div1), and
J18-158 (CI Div2).
SPECIAL WARNINGS AND INFORMATION
EQUIPMENT USED IN CLASS I, DIV 2 AND ZONE 2 HAZARDOUS LOCATIONS
Refer to Chapter 2 – Specications for details about the suitability of this equipment in hazard-
ous areas.
Explosion Hazard – Substitution of components may impair suitability for
hazardous locations.
Risque d’explosion – La substitution de composants peut rendre ce materiel
inacceptable pour les emplacements sont designés dangereux.
Explosion Hazard – Do not disconnect equipment unless power has been
switched o or the area is known to be non-hazardous.
Risque d’explosion – Avant de déconnecter l’équipement, coupez le courant où
vousassurez que l’emplacement est designé non dangereux.
All input and output wiring must be in accordance with Class I, Division 2 and Zone 2 wiring methods (NEC
Sec 501.4(b) or CEC 18-152) and in accordance with the authority having jurisdiction.