EasyManua.ls Logo

Anker SOLIX X1 - Page 63

Anker SOLIX X1
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
60
Delete System
Delete a system that has not completed commissioning.
After commissioning, please inform the owner that the equipment can only be turned o using the Anker app until
grid connection approval is granted. Once approval is complete, the equipment can be turned on and o using the
Anker app.
8. Screen and Light Guide
8.1 LED Screen Guide
The LED screen will show you the status of the system. When multiple power modules are connected in parallel, only one of
them will display the overall status.
1
345
2

Related product manuals