11.1 PRE-START PROCEDURES & CHECKS
•
trades person, the system is now ready for operation.
• Before turning the system on it is essential that you ensure the heat pump storage tank is
• Air pockets must be bled from the system via a hot water tap. Do not use the PTR valve
alone to bleed the system.
•
installed from the condensate port to an appropriate drainage point.
• Ensure that your plumber has insulated with high temperature closed cell insulation to
prevent heat loss.
•
23
COMMISSIONING THE SYSTEM