61
10.0 SCHEDULED PREVENTATIVE MAINTENANCE
10.1 Routine Maintenance
It is recommended that routine maintenance be carried out above the standard daily cleaning procedure.
Maintenance should relate to volume of water consumed during a service period. Volume is determined
by the amount of water consumed into the machine during a specic period.
Water requirements are outlined in section 5.4 INSTALLATION REQUIREMENTS. Filtration required: pH
6.9-7.1, hardness 80-120PPM, temperature at 24 degrees Celsius (ltration not included).
All maintenance should be performed by a qualied technical person following Aremde Nexus/Stylus
maintenance schedule in section 10.3 SERVICE INFORMATION.
All parts must be replaced using genuine Aremde components.
If the electrical wiring or hydraulic pipework is seen to be deteriorating, fatigued, or damaged, a qualied
service technician must perform the work.
All faults should be repaired immediately to ensure further damage is not caused. Small faults can lead
to major mechanical failure. We advise to engage an Aremde approved technical company to perform the
work. Please contact info@aremde.com.au to nd the nearest representative.