Aux. test ##.#V ####s Battery test activated
START PREPARE The start prepare relay is activated.
START RELAY ON The start relay is activated.
START RELAY OFF The start relay is deactivated during the start sequence.
MAINS FAILURE Mains failure and mains failure timer expired.
MAINS FAILURE IN ###s Frequency or voltage measurement is outside the limits. The timer shown is the Mains failure delay. Text in mains
units.
MAINS U OK DEL ####s Mains voltage is OK after a mains failure. The timer shown is the Mains OK delay.
MAINS f OK DEL ####s Mains frequency is OK after a mains failure. The timer shown is the Mains OK delay.
Hz/V OK IN ###s The voltage and frequency on the genset is OK. When the timer runs out it is allowed to operate the generator
breaker.
COOLING DOWN ###s Cooling down period is activated.
COOLING DOWN Cooling down period is activated and infinite. Cooling down timer is set to 0.0 s.
GENSET STOPPING This info is shown when cooling down has finished.
EXT. STOP TIME ###s Extended stop time. The unit will stop after a pre-programmed time of x.x s. after having received a stop signal.
EXT. START ORDER A planned AMF sequence is activated. There is no failure on the mains during this sequence.
Display Description

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas Copco QAS 60 Pd S3A ESF and is the answer not in the manual?

Atlas Copco QAS 60 Pd S3A ESF Specifications

General IconGeneral
BrandAtlas Copco
ModelQAS 60 Pd S3A ESF
CategoryPortable Generator
LanguageEnglish

Related product manuals