- 46 -
5 Maintenance
5.1 Maintenance schedule
z
Before carrying out any maintenance activity, check that the start switch is in position O and that no electrical power is present on the terminals.
Maintenance schedule Daily
50 hrs
after initial
start-up
Every 500
hours
Every 1000
hours
Every 2000
hours
Yearly
Service pak - - 2912 4546 05 1636 3103 37 1636 3103 38 -
For the most important subassemblies, Atlas Copco has developed service kits that combine all wear parts. These service kits offer you the benefits of genuine parts,
save on administration costs and are offered at reduced price, compared to the loose components. Refer to the parts list for more information on the contents of the
service kits.
Engine
Drain water from fuel filter x
Check/Fill fuel level (3) x
Drain/Clean fuel tank water and sediment (1) (13) x x x x
Replace fuel (primary)filter(s) (5) x x x x
Replace fuel (secondary)filter(s) (5) x x x x
Replace fuel tank breather filter xx
Check fuel injectors (2) x
Check external fuel connection (option) xxx
Clean air filter vacuator valves x
Check air intake vacuum indicator x
Check/Replace safety cartridge x x x x
Replace air filter element (1) x x x x
Check/Test glow plugs - grid heater xx
!