Maintenance Schedule 41
PV-12P
Maintenance Schedule
Monthly:
1. Re-torque the anchor bolts to 65-86 Ft Lbs;
2. Check all connectors, bolts, pulleys and pins;
3. Lubricate cable with lubricant;
4. Make a visual inspection of all hydraulic hoses/lines for possible wear or
leakage;
5. Check the condition of the safety lock device;
6. Lubricate all rollers and pins with 90wt. Gear oil or equivalent;
Note: All anchor bolts should take full torque. If any of the anchors do
not tighten, DO NOT use the lift until the bolt has been replaced.
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check and adjust the equalization tension on the cables for level lifting.
3. Check the columns for plumb.
4. Check rubber pads and replace as necessary.
5. Check safety lock device and make sure they are in condition.