EasyManuals Logo

Atlas PV-12PX User Manual

Atlas PV-12PX
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
Maintenance Schedule 41
PV-12P
Maintenance Schedule
Monthly:
1. Re-torque the anchor bolts to 65-86 Ft Lbs;
2. Check all connectors, bolts, pulleys and pins;
3. Lubricate cable with lubricant;
4. Make a visual inspection of all hydraulic hoses/lines for possible wear or
leakage;
5. Check the condition of the safety lock device;
6. Lubricate all rollers and pins with 90wt. Gear oil or equivalent;
Note: All anchor bolts should take full torque. If any of the anchors do
not tighten, DO NOT use the lift until the bolt has been replaced.
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check and adjust the equalization tension on the cables for level lifting.
3. Check the columns for plumb.
4. Check rubber pads and replace as necessary.
5. Check safety lock device and make sure they are in condition.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas PV-12PX and is the answer not in the manual?

Atlas PV-12PX Specifications

General IconGeneral
BrandAtlas
ModelPV-12PX
CategoryLifting Systems
LanguageEnglish

Related product manuals