Installation Requirements 7
PV-12P
Concrete Specifi cations
Concrete specifi cations must be followed accordingly.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be 6 inches minimum and must be totally cured before lift
installation.
2. Concrete must be in good condition and must have a test strength 3,500psi
minimum.
3. Floors must be level and no cracks.
Fig. 4
Power Supply
220 volt single phase 30 amp breaker with minimum of 10 gauge wire.
Voltage range 208v – 230V
Concrete strength 3,500psi
6”
6”
36