EasyManua.ls Logo

Axis ATA1200 - 8 Preparing Scale to Work

Axis ATA1200
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10 USER MANUAL
__________________________________________________________________________________________________________________
8. Preparing scale to work
1. Take the scale and feeder out of the
package. It is recommended to keep the
original scale package in order to transport
the balance safely in future.
2. Place the scale on a stable ground not
affected by mechanical vibrations and
airflows.
3. Level the scale using rotating legs 6 so
that the air bubble in water level 7 at the back
of the scale is in the middle.
4. Put draft shield 8 on the scale and cover 9
on it.
Scale should be transported in the way, that there is no risk of accidental pressing or
overweighing a pan.
If the scale was taken from a lower temperature surrounding to a room with higher
temperature, e.g. in winter, moisture can liquefy on the scale casing. Do not connect power
supply to the scale, because this can cause damage or improper work of the scale. In this
case leave the scale for at least 4 hours unplugged for acclimatization.
6
1
8
9
2
5
3
4
7

Related product manuals