EasyManua.ls Logo

Basler BE3-GPR - BE3-GPR (TOC) P-1 with Three-Phase, Three Wire, Line-To-Line Sensing and 5 A Cts

Basler BE3-GPR
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
4-15
353433
2624
3231
22
91113
+
20
-
73
3736 38 39 40 41 42 43 51504948474644 45 59585756555452 53 67666564636260 61 68 69 70
D2620-08
01-31-00
OV
OC
PH
WDT REV
REACT
SYNC
PROGRAM
ENABLE
OUTPUT
DISABLE
SAFE
ENABLE
BUS
GEN
A
B
C
TRIP
RESET
TO BUS
BREAKER
CLOSE
CIRCUIT
TO
TRIP
CIRCUITS
TO
GPR
FAIL
CIRCUIT
TO TRIP CIRCUITS
2
1
1
IT IS IMPERATIVE THAT THIS INPUT BE
PROPERLY CONNECTED IN RELATIONSHIP
WITH TERMINALS 22, 24, AND 26.
2
3
3
NOTES:
INPUT IS NOT REQUIRED IF SYNC-CHECK
IS NOT PRESENT.
12 VDC
OR
24 VDC
TERMINAL 35 IS COMMON FOR PHASE A, B, AND C
CT CONNECTIONS. FOR 5A CTS, PHASE A CT
CONNECTS TO TERMINAL 33, PHASE B CT CONNECTS
TO TERMINAL 31, AND PHASE C CT CONNECTS TO
TERMINAL 29. ALL THREE CT CONNECTIONS MUST
USE THE SAME QUANTITY (EITHER 5A OR 1A).
-+
BE3-GPR
UV OF UF1 UF2
BAL
CHECKCURFAIL PWR
24681012
FAIL
1
1
ØB CT
29 30
ØC CT
ØA CT
BUS ØB
BUS ØA
ØBØC
ØA
Figure 4-16. BE3-GPR (TOC) P-1 With Three-Phase, Three Wire, Line-to-Line Sensing, and 5A CTs

Table of Contents

Related product manuals