6. Screw the lifting rings into the locations provided. Tightening torque:
23 N.m.
Important
The rings are supplied with the boiler.
7. Remove the screws attaching the boiler to the pallet.
8. Use carrying bars or slings (not provided) to move the boiler.
Sling attachment angle β < 60°
POWER HT+ 1.130 126 kg
POWER HT+ 1.150 132 kg
Caution
Moving the boiler is a job for two people.
9. Close the boiler.
(1)
Adjustment range for the feet: 30 mm
10. Level the boiler using the adjustable feet.
Fig.33