7. Screw the lifting rings into the locations provided. Tightening torque:
23 N.m.
Important
The rings are supplied with the boiler.
8. Remove the screws attaching the boiler to the pallet.
9. Use slings (not provided) to move the boiler.
Sling attachment angle β < 60°
POWER HT+ 1.200 212 kg
POWER HT+ 1.250 232 kg
Caution
Moving the boiler is a job for two people.
10. Close the boiler.
Fig.50