PREPARING FOR TREATMENT (Section 4.2.1-4.2.3) 3
LINING THE MACHINE – ARTERIAL LINE (Section 4.2.4) 6
PREPARING THE SALINE INFUSION LINE 8
LINING THE MACHINE – VENOUS LINE (Section 4.2.5) 9
LINING THE MACHINE – HEPARIN SYRINGE PUMP (Section 4.2.6) 11
PRIMING THE DIALYSIS CIRCUIT (Section 4.2.7.3) 13
SETTING PARAMETERS (Section 4.2.9-4.2.11) 17
CONNECT TO THE DIALYSIS SYSTEM (Section 4.2.12) 20
START THE TREATMENT (Section 4.2.13) 22
END OF TREATMENT AND DISCONNECTION (Section 4.3.1) 25
EMPTYING THE BLOOD LINES 29
HEAT DISINFECTION WITH CLEANCART (Section 10.3.4) 31
INTEGRATED DISINFECTION (Section 10.3.7) 32
TROUBLESHOOTING 33
Table of Contents
CAMP/MG208/19-0007 2AK 98 Independent Home Dialysis System
These instructions are based on the use of the WRO 300 H unit, if you are using another WRO you should follow the instructions for use for that unit.
These short instructions are for the use of the AK 98 dialysis machine running with software version 3.0xx. The operator of the machine should still read and understand the full
text of the AK 98 dialysis machine Operator's Manual, sw 3.0xx, HC12810002 20/01/01, before performing a patient treatment.
Important Notice!
The information in this document does not relieve any user from his or her duty to carefully read the full text of
the Operator’s Manual for the AK98 Dialysis Machine [HC12810002 20/01/01].
If there are deviations between the text contained in this document and the Operator’s Manual,
then the Operator’s Manual takes precedence.